Telecoms - Vendor Specific Courses

Our Openreach courses enable the trainee to become proficient in Openreach specific requirements. Employers can be assured that their delegates fully understand the course content and are able to become productive as soon as the course requirements have been met.

Course Name Duration Accreditation Next Running Location Cost Certification Cost
A10 - Safety Vehicle Safety & Health Check Point Half Day Openreach On Demand As Required POA Included
A11 - The Location of Underground Services 1 Day Openreach On Demand As Required POA Included
A13 - MEWP Vehicle Safety 1 Day Openreach On Demand As Required POA Included
A14 - Pole Erection Unit & Vehicle Safety 1 Day Openreach On Demand As Required POA Included
A16 - Safety - Managed Install Half Day Openreach On Demand As Required POA Included
BB1B - Box Building 1 (Brick) 2 Days Openreach On Demand As Required POA Included
BB1C - Box Building 1 (Concrete) 2 Days Openreach On Demand As Required POA Included
BB1M - Box Building 1 (Modular) 2 Days Openreach On Demand As Required POA Included
C1 - Internal Wiring 3 Days Openreach On Demand As Required POA Included
C4 - NTE/NTP Installation 3 Days Openreach On Demand As Required POA Included
C5 - NTE/NTP & Internal wiring (contractor only) 3 Days Openreach On Demand As Required POA Included
C6 - Internal NTTP / DP Wiring and Installation 3 Days Openreach On Demand As Required POA Included
CCC1 - Cabinets Cross Connection 1 1 Day Openreach On Demand As Required POA Included
CD1 - Core Drilling 1 Day Openreach On Demand As Required POA Included
D1 - Circuit, Cable & Pair Identification 1 Day Openreach On Demand As Required POA Included
DB1 - Duct Blockages 1 1 Day Openreach On Demand As Required POA Included
DL1 - Duct Laying 1 1 Day Openreach On Demand As Required POA Included
E1 - Dropwire & Overhead Techniques 2 Day Openreach On Demand As Required POA Included
F1 - Mechanical Closures (30 and 34 Series) 1 and Half Days Openreach On Demand As Required POA Included
F10 - PCP Construction & Maintenance (Non Civils) 5 Days Openreach On Demand As Required POA Included
F11 - First Look Repair (Mechanical Closures) 2 Days Openreach On Demand As Required POA Included
F15 - Working in UCJ type closure only 1 and Half Days Openreach On Demand As Required POA Included
F16 - PCP De-load and Re-load 3 Days Openreach On Demand As Required POA Included
F2 - Jointing Closures 1 and Half Days Openreach On Demand As Required POA Included
F3 - Block Terminal Changeover 1 and Half Days Openreach On Demand As Required POA Included
F4 - Faulty Cable Changeover 3 Days Openreach On Demand As Required POA Included
F5 - Working in PCP's 1 Day Openreach On Demand As Required POA Included
F6 - Sleeves 34 Half Day Openreach On Demand As Required POA Included
F7 - Underground Quality Observations 1 and Half Days Openreach On Demand As Required POA Included
F8 - Modular Jointing 1 and Half Days Openreach On Demand As Required POA Included
F9 - In-Line & Capend Mechanical Closures 1 and Half Days Openreach On Demand As Required POA Included
FCCW1 - Frame & Cover Renewal - Carriageway (Operative) 2 Days Openreach On Demand As Required POA Included
FCCW1S - Frame & Cover Renewal - Carriageway (Supervisor) 2 Days Openreach On Demand As Required POA Included
FCFW1 - Frame & Cover Renewal - Footway (Operative) 2 Days Openreach On Demand As Required POA Included
FCFW1S - Frame & Cover Renewal - Footway (Supervisor) 2 Days Openreach On Demand As Required POA Included
G1 - Use of Testers on PSTN Faults 1 Day Openreach On Demand As Required POA Included
G2 - Faulting Techniques (SA 9083 & Tester 301) 1 Day Openreach On Demand As Required POA Included
G5 - Testing in the Metallic Network 1 Day Openreach On Demand As Required POA Included
G6 - Repetitive Electrical Impulse Noise (REIN) 1 Day Openreach On Demand As Required POA Included
G7 - Broadband Boost & SFI2 1 Day Openreach On Demand As Required POA Included
GO1 - General Operatives 1 1 Day Openreach On Demand As Required POA Included
GO2 - General Operatives 2 1 Day Openreach On Demand As Required POA Included
H1 - Frames Basic 2 Days Openreach On Demand As Required POA Included
H2 - MDF Techniques 1 Day Openreach On Demand As Required POA Included
H4 - Frames Faulting Half Day Openreach On Demand As Required POA Included
H5 - Frames Primary 1 Day Openreach On Demand As Required POA Included
H6 - EVOTAM Installation 1 and Half Days Openreach On Demand As Required POA Included
H7 - LLU TAM Installation 1 and Half Days Openreach On Demand As Required POA Included
J1 - External Fibre Quality 1 Day Openreach On Demand As Required POA Included
J2 - Fibre Frames 1 and Half Days Openreach On Demand As Required POA Included
J4 - Optic Fibre (customers premises) 1 Day Openreach On Demand As Required POA Included
J5 - Fibre Drop Cable (FDC) 1 Day Openreach On Demand As Required POA Included
J6 - Optical Fibre 2 Days Openreach On Demand As Required POA Included
J7 - Optic Fibre Private circuit (customers premises) 2 Days Openreach On Demand As Required POA Included
J8 - Internal Fibre Cabling 2 Days Openreach On Demand As Required POA Included
K3 - Lightweight Aerial Cabling 1 Day Openreach On Demand As Required POA Included
K4 - Heavyweight Aerial Cabling 1 Day Openreach On Demand As Required POA Included
K5 - Cabling in Duct (Heavy) 3 Days Openreach On Demand As Required POA Included
K6 - Optical Fibre Cabling 1 Day Openreach On Demand As Required POA Included
K7 - Telenco Aerial Cabling 1 Day Openreach On Demand As Required POA Included
K8 - Hand Rodding in the UG Network 1 Day Openreach On Demand As Required POA Included
N12 - FTTP COF 205 Cabling 1 Day Openreach On Demand As Required POA Included
N15 - FTTP FDP Prysmian 1 and Half Days Openreach On Demand As Required POA Included
N16 - FTTP Pole Mounted FDP 1 and Half Days Openreach On Demand As Required POA Included
N17 - HND/FOD Dual Split Network (UG) 3 Days Openreach On Demand As Required POA Included
N19 - HND/FOD Dual Split Network (OH) 3 Days Openreach On Demand As Required POA Included
N20 - FTTP New Sites - SDU 3 Days Openreach On Demand As Required POA Included
N22 - One Fibre Network FTTP L2C Provition 1 Day Openreach On Demand As Required POA Included
N23 - One Fibre Network FTTP Strategic UG and OH build 5 Days Openreach On Demand As Required POA Included
N27 - One Fibre Network Cabling in the Overhead Network 2 Days Openreach On Demand As Required POA Included
N28 - One Fibre Network Cabling in the Underground Network 1 Day Openreach On Demand As Required POA Included
N29 - FTTP Connectorised MDU - P&B Activities 2 Days Openreach On Demand As Required POA Included
N3 - FTTC Tie Cable Assessment 1 and Half Days Openreach On Demand As Required POA Included
N4 - FTTC OCR 3 Days Openreach On Demand As Required POA Included
N5 - FTTC RDSLAM - Fibre 2 Days Openreach On Demand As Required POA Included
N7 - FTTP SDMB6 & BFT 7/12 Tube Installation 1 Day Openreach On Demand As Required POA Included
N8 - FTTP Manifold Construction 1 Day Openreach On Demand As Required POA Included
N9 - FTTP Jointing & Fibre Management 3 Days Openreach On Demand As Required POA Included
O1 - Pole Erection Unit & Vehicle Safety 2 and Half Days Openreach On Demand As Required POA Included
O2 - Pole Stack working, handling & loading 2 and Half Days Openreach On Demand As Required POA Included
O3 - Pole Dressing 2 and Half Days Openreach On Demand As Required POA Included
O4 - Mechanised Pole Erection with Screw Anchor 2 and Half Days Openreach On Demand As Required POA Included
O5 - Mechanised Pole Recovery 2 and Half Days Openreach On Demand As Required POA Included
O6 - Manual Pole Staying 2 and Half Days Openreach On Demand As Required POA Included
O7 - Pole Erection 2 and Half Days Openreach On Demand As Required POA Included
PCP De-load and Re-load 3 Days Openreach On Demand As Required POA Included
R1 - E Side and Pressure 3 Days Openreach On Demand As Required POA Included
R2 - E Side and Pressure Detection 2 Days Openreach On Demand As Required POA Included
S11 - FTTP Accreditation for Surveyors (Assessment) - PART 2 1 Day Openreach On Demand As Required POA Included
S11 - FTTP Accreditation for Surveyors (Training) - PART 1 2 Days Openreach On Demand As Required POA Included
S5 - PIA Pole Survey 2 Days Openreach On Demand As Required POA Included
S6 - PIA Duct Survey 2 Days Openreach On Demand As Required POA Included
S7 - PIA Sub-Duct and Cable Installation 2 Days Openreach On Demand As Required POA Included
S8 - PIA Overhead Cable Installation 3 Days Openreach On Demand As Required POA Included
SA001 - Safety Overhead 3 Days Smart Awards On Demand As Required POA Included
SA002 - Safety Underground 1 Day Smart Awards On Demand As Required POA Included
SLEW1 - Slewing 1 1 Day Openreach On Demand As Required POA Included

All training course prices are exclusive of VAT