All Courses

You will find many Of our standard courses in the following list. Additionally, we are able to provide bespoke training courses allowing the mixing of modules from differing courses
Please get in touch if this is something you would like to investigate further.

Course Name Duration Accreditation Next Running Location Cost Certification Cost
360 Excavator Above 10 Tonne (Experienced) 1 Day EUSR On Demand As Required £1,749.00 £34.20
360 Excavator Above 10 Tonne (Novice) 5 Days EUSR On Demand As Required £4,249.00 £34.20
360 Excavator Below 10 Tonne (Experienced) I Day EUSR On Demand As Required £1,649.00 £34.20
360 Excavator Below 10 Tonne (Novice) 5 Days EUSR On Demand As Required £3,995.00 £34.20
Banksman 1 Day NPORS On Demand As Required £1,649.00 £27.00
Dumper Truck (Experienced) 1 Day NPORS On Demand As Required £1,499.00 £27.00
Dumper Truck (Novice) 3 Days NPORS On Demand As Required £3,499.00 £27.00
First Aid at Work Place 3 Days Smart Awards On Demand As Required £219.50 Included
Level 2 Diploma in Smart Metering - Dual Fuel 17 Weeks of which 7 weeks is field budding sponsored by your employer Smart Awards On Demand As Required POA
Level 2 Diploma in Smart Metering – Gas 11 Weeks of which 4 weeks is field budding sponsored by your employer Smart Awards On Demand As Required POA
Level 2 Diploma in Smart Metering – Power 8 Weeks of which 3 weeks is field budding sponsored by your employer Smart Awards On Demand As Required POA
Manual Handling Training Half Day Smart Awards On Demand As Required £79.50 included
MEWP 51 ft - Course for up 6 Delegates 1 Day NPORS On Demand As Required £1,599.00 £27
Quick Hitch 1 Day NPORS On Demand As Required £1,649.00 £27.00
Slinger / Signaller (Experienced) 1 Day NPORS On Demand As Required £1,649.00 £27.00
Slinger / Signaller (Novice) 2 Days NPORS On Demand As Required £1,799.00 £27.00
Telescopic Handler (Experienced) 1 Day NPORS On Demand As Required £1,749.00 £27.00
Telescopic Handler (Novice) 5 Days NPORS On Demand As Required £4,249.00 £27.00
Utility SHEA (Telecommunications) (EUSR) 1 Day EUSR On Demand As Required £124.50 £34.20
A10 - Safety Vehicle Safety & Health Check Point Half Day Openreach On Demand As Required £60.00 Included
A11 - The Location of Underground Services 1 Day Openreach On Demand As Required £120.00 Included
A12 - Safety Working on Joint User Poles Half Day Openreach On Demand As Required £60.00 Included
A13 - MEWP Vehicle Safety Half Day Openreach On Demand As Required £60.00 Included
A14 - Pole Erection Unit & Vehicle Safety 1 Day Openreach On Demand As Required £120.00 Included
A16 - Safety - Managed Install Half Day Openreach On Demand As Required £60.00 Included
A8 - Safety Overhead 2 Days Openreach On Demand As Required £240.00 Included
A9 - Safety Underground 1 Day Openreach On Demand As Required £120.00 Included
Abrasive Wheels Training Half Day Smart Awards On Demand As Required £79.50 Included
Asbestos Awareness Half Day UKATA On Demand As Required £79.50 £34.20
BB1B - Box Building 1 (Brick) 2 Days Openreach On Demand As Required £240.00 Included
BB1C - Box Building 1 (Concrete) 2 Days Openreach On Demand As Required £240.00 Included
BB1M - Box Building 1 (Modular) 2 Days Openreach On Demand As Required £240.00 Included
BB2C - Box Building 2 (Concrete) 2 Days Openreach On Demand As Required £240.00 Included
BB3C - Box Building 3 (Concrete) 2 Days Openreach On Demand As Required £240.00 Included
BPEC Gas Training Course ACS CCN1 + Portfolio assessment (Novice) 5 Weeks BPEC On Demand As Required £2,295.00 £40.00
BPEC Gas Training Course ACS CCN1 + Portfolio assessment (Qualified Plumber) 3 Weeks BPEC On Demand As Required £1,895.00 £40.00
C1 - Internal Wiring 3 Days Openreach On Demand As Required £360.00 Included
C4 - NTE/NTP Installation 3 Days Openreach On Demand As Required £360.00 Included
C5 - NTE/NTP & Internal wiring (contractor only) 3 Days Openreach On Demand As Required £360.00 Included
C6 - Internal NTTP / DP Wiring and Installation 3 Days Openreach On Demand As Required £360.00 Included
CCC1 - Cabinets Cross Connection 1 2 Days Openreach On Demand As Required £240.00 Included
CCN 1: Core Gas Safety & 3 Appliances + CPA1 Initial Assessment 5 Days BPEC On Demand As Required £695.00 £40.00
CCN 1: Core Gas Safety & 3 Appliances + CPA1 Reassessment 5 Days BPEC On Demand As Required £545.00 £40.00
CD1 - Core Drilling 2 Days Openreach On Demand As Required £240.00 Included
CENWAT 1: Central Heating Boilers Initial and Reassessment 1 Day BPEC On Demand As Required £120.00 £40.00
City & Guilds 2365-02 Level 2 Electrical Course 7 Weeks City & Guilds On Demand As Required £2,495.00 Inc
City & Guilds 2365-03 Level 3 Electrical Installation Diploma 7 Weeks City & Guilds On Demand As Required £2,295.00 Inc
City & Guilds 2377-22 Level 3 Portable Appliance Testing qualification 2 Days City & Guilds On Demand As Required £175.00 £40.00
City & Guilds 2382-15 Level 3 (17th edition) Requirements for Electrical Installations 3 Days City & Guilds On Demand As Required £315.00 £40.00
City & Guilds 2392 – Fundamental Testing & Inspection 5 Days City & Guilds On Demand As Required £425.00 £40.00
CKR 1: Domestic Cookers Initial and Reassessment 1 Day BPEC On Demand As Required £120.00 £40.00
CSA - Confined Space Awareness 1 Day Openreach On Demand As Required £120.00 Included
D1 - Circuit, Cable & Pair Identification 1 Day Openreach On Demand As Required £120.00 Included
DB1 - Duct Blockages 1 2 Days Openreach On Demand As Required £240.00 Included
DL1 - Duct Laying 1 2 Days Openreach On Demand As Required £240.00 Included
DL2 - Duct Laying 2 2 Days Openreach On Demand As Required £240.00 Included
DL3 - Duct Laying 3 2 Days Openreach On Demand As Required £240.00 Included
E1 - Dropwire & Overhead Techniques 1 Day Openreach On Demand As Required £120.00 Included
E2 - Overhead Quality 1 and Half Days Openreach On Demand As Required £180.00 Included
E3 - Drop-Wire/Underground Terminations 1 and Half Days Openreach On Demand As Required £180.00 Included
E4 - Overhead Quality for Contractors 1 and Half Days Openreach On Demand As Required £180.00 Included
Emergency First Aid Level 2 1 Day Smart Awards On Demand As Required £119.50 Included
EUSR Abrasive Wheels Training Half Day EUSR On Demand As Required £79.50 34.20
F1 - Mechanical Closures (30 and 34 Series) 1 and Half Days Openreach On Demand As Required £180.00 Included
F10 - PCP Construction & Maintenance (Non Civils) 3 Days Openreach On Demand As Required £360.00 Included
F11 - First Look Repair (Mechanical Closures) 2 Days Openreach On Demand As Required £240.00 Included
F15 - Working in UCJ type closure only 1 and Half Days Openreach On Demand As Required £180.00 Included
F2 - Jointing Closures 1 and Half Days Openreach On Demand As Required £180.00 Included
F3 - Block Terminal Changeover 1 and Half Days Openreach On Demand As Required £180.00 Included
F4 - Faulty Cable Changeover 3 Days Openreach On Demand As Required £360.00 Included
F5 - Working in PCP's 2 Days Openreach On Demand As Required £240.00 Included
F6 - Sleeves 34 Half Day Openreach On Demand As Required £60.00 Included
F7 - Underground Quality Observations 1 and Half Days Openreach On Demand As Required £180.00 Included
F8 - Modular Jointing 1 and Half Days Openreach On Demand As Required £180.00 Included
F9 - In-Line & Capend Mechanical Closures 1 and Half Days Openreach On Demand As Required £180.00 Included
Face Fit Testing Half Day Smart Awards On Demand As Required £79.50 Included
FCCW1 - Frame & Cover Renewal - Carriageway (Operative) 2 Days Openreach On Demand As Required £240.00 Included
FCCW1S - Frame & Cover Renewal - Carriageway (Supervisor) 2 Days Openreach On Demand As Required £240.00 Included
FCFW1S - Frame & Cover Renewal - Footway (Supervisor) 2 Days Openreach On Demand As Required £240.00 Included
Fire Marshal Training Half Day Smart Awards On Demand As Required £79.50 Included
G1 - Use of Testers on PSTN Faults 1 Day Openreach On Demand As Required £120.00 Included
G2 - Faulting Techniques (SA 9083 & Tester 301) 1 Day Openreach On Demand As Required £120.00 Included
G5 - Testing in the Metallic Network 1 Day Openreach On Demand As Required £120.00 Included
G6 - Repetitive Electrical Impulse Noise (REIN) 1 Day Openreach On Demand As Required £120.00 Included
G7 - Broadband Boost & SFI2 1 Day Openreach On Demand As Required £120.00 Included
H1 - Frames Basic 2 Days Openreach On Demand As Required £240.00 Included
H2 - MDF Techniques 1 Day Openreach On Demand As Required £120.00 Included
H4 - Frames Faulting Half Day Openreach On Demand As Required £60.00 Included
H5 - Frames Primary 1 Day Openreach On Demand As Required £120.00 Included
H6 - EVOTAM Installation 1 and Half Days Openreach On Demand As Required £180.00 Included
H7 - LLU TAM Installation 1 and Half Days Openreach On Demand As Required £180.00 Included
HTR 1: Gas Fires and Wall Heaters Initial and Reassessment 1 Day BPEC On Demand As Required £120.00 £40.00
J1 - External Fibre Quality 1 and Half Days Openreach On Demand As Required £180.00 Included
J2 - Fibre Frames 1 and Half Days Openreach On Demand As Required £180.00 Included
J4 - Optic Fibre (customers premises) 2 Days Openreach On Demand As Required £240.00 Included
J5 - Fibre Drop Cable (FDC) 2 Days Openreach On Demand As Required £240.00 Included
J6 - Optical Fibre 2 Days Openreach On Demand As Required £240.00 Included
J7 - Optic Fibre Private circuit (customers premises) 2 Days Openreach On Demand As Required £240.00 Included
J8 - Internal Fibre Cabling 2 Days Openreach On Demand As Required £240.00 Included
K1 - Cabling in Duct & Vehicles 1 and Half Days Openreach On Demand As Required £180.00 Included
K2 - Cabling in Duct - Provide 1 and Half Days Openreach On Demand As Required £180.00 Included
K3 - Lightweight Aerial Cabling 1 and Half Days Openreach On Demand As Required £180.00 Included
K4 - Heavyweight Aerial Cabling 3 Days Openreach On Demand As Required £360.00 Included
K5 - Cabling in Duct (Heavy) 3 Days Openreach On Demand As Required £360.00 Included
K6 - Optical Fibre Cabling 1 and Half Days Openreach On Demand As Required £180.00 Included
K7 - Telenco Aerial Cabling 2 Days Openreach On Demand As Required £240.00 Included
Ladder Inspection Training 1 Day Smart Awards On Demand As Required £79.50 Inc
M1 - Assessment for the D side Network 2 Days Openreach On Demand As Required £240.00 Included
M2 - Assessment for O/H Dropwire 2 Days Openreach On Demand As Required £240.00 Included
M3 - Assessment for 'E' side network 2 Days Openreach On Demand As Required £240.00 Included
M4 - Assessment for O/H poling / aerial cable 1 Day Openreach On Demand As Required £120.00 Included
M5 - Assessment for MDF (Frames) 1 Day Openreach On Demand As Required £120.00 Included
MET 1: Meters Initial and Reassessment 1 Day BPEC On Demand As Required £120.00 £40.00
N12 - FTTP COF 205 Cabling 1 Day Openreach On Demand As Required £120.00 Included
N15 - FTTP FDP Prysmian 1 and Half Days Openreach On Demand As Required £180.00 Included
N16 - FTTP Pole Mounted FDP 1 and Half Days Openreach On Demand As Required £180.00 Included
N17 - HND/FOD Dual Split Network (UG) 3 Days Openreach On Demand As Required £360.00 Included
N19 - HND/FOD Dual Split Network (OH) 3 Days Openreach On Demand As Required £360.00 Included
N20 - FTTP New Sites - SDU 3 Days Openreach On Demand As Required £360.00 Included
N22 - One Fibre Network FTTP L2C Provition 2 Days Openreach On Demand As Required £240.00 Included
N23 - One Fibe Network FTTP Strategic UG and OH build 5 Days Openreach On Demand As Required £600.00 Included
N3 - FTTC Tie Cable Assessment 1 and Half Days Openreach On Demand As Required £180.00 Included
N4 - FTTC OCR 3 Days Openreach On Demand As Required £360.00 Included
N5 - FTTC RDSLAM - Fibre 2 Days Openreach On Demand As Required £240.00 Included
N7 - FTTP SDMB6 & BFT 7/12 Tube Installation 1 Day Openreach On Demand As Required £120.00 Included
N8 - FTTP Manifold Construction 1 Day Openreach On Demand As Required £120.00 Included
N9 - FTTP Jointing & Fibre Management 5 Days Openreach On Demand As Required £600.00 Included
O1 - Pole Erection Unit & Vehicle Safety 2 and Half Days Openreach On Demand As Required £300.00 Included
O2 - Pole Stack working, handling & loading 2 and Half Days Openreach On Demand As Required £300.00 Included
O3 - Pole Dressing 2 and Half Days Openreach On Demand As Required £300.00 Included
O4 - Mechanised Pole Erection with Screw Anchor 2 and Half Days Openreach On Demand As Required £300.00 Included
O5 - Mechanised Pole Recovery 2 and Half Days Openreach On Demand As Required £300.00 Included
O6 - Manual Pole Staying 2 and Half Days Openreach On Demand As Required £300.00 Included
O7 - Pole Erection 2 and Half Days Openreach On Demand As Required £300.00 Included
Part P Electrical Course (Full Scope Domestic Electrical Installer) 6 Days BPEC On Demand As Required £795.00 £40.00
R1 - E Side and Pressure 3 Days Openreach On Demand As Required £360.00 Included
R2 - E Side and Pressure Detection 2 Days Openreach On Demand As Required £240.00 Included
City & Guilds Low Risk Confined Spaces Level 2 1 Day City & Guilds 25/09/2017 Bury £149.50 Included
EUSR Category 1: Locate Utility Services 1 Day EUSR On Demand As Required £124.50 £34.20
EUSR SHEA Water I Day EUSR On Demand As Required £124.50 £34.20
NRSWA Operative Course Units 1 - 6 & 9. 5 Days City & Guilds 25/09/2017 Bury £549.50 £36.20
City & Guilds Medium Risk Confined Space Level 2 2 Days City & Guilds 25/09/2017 Bury £259.50 Included
EUSR Category 2: Implement Safe (Digging) Excavating Practices 1 Day EUSR On Demand As Required £124.50 £34.20
EUSR SHEA Power I Day EUSR On Demand As Required £124.50 £34.20
NRSWA Supervisor Course Units 1, 10 - 14, & 16 5 Days City & Guilds 25/09/2017 Bury £549.50 £36.20
City & Guilds High Risk Confined Space Level 2 3 Days City & Guilds 25/09/2017 Bury £359.50 Included
EUSR Deep Excavation Timber & Steel Shoring 2 Days EUSR On Demand As Required £349.50 £34.20
EUSR SHEA Gas I Day EUSR On Demand As Required £124.50 £34.20
NRSWA Operative Reassessment 2 Days City & Guilds 25/09/2017 Bury £179.50 £36.20
EUSR Deep Excavation Timber Steel & Proprietary Shoring 4 Days EUSR On Demand As Required £449.50 £34.20
EUSR Electro Fusion 2 Days EUSR On Demand As Required £259.50 £34.20
NRSWA Supervisor Reassessment 2 Days City & Guilds 25/09/2017 Bury £179.50 £36.20
City & Guilds Medium Risk Confined Space Reassessment 1 Day City & Guilds 25/09/2017 Bury £149.50 Included
EUSR Butt Fusion 2 Days EUSR On Demand As Required £259.50 £34.20
NRSWA Unit 1-Location & avoidence of underground apparatus 1 Day City & Guilds On Demand As Required £109.50 £36.20
City & Guilds High Risk Confined Spaces Reassessment 2 Days City & Guilds 25/09/2017 Bury £259.50 Included
EUSR Pressure Testing I Day EUSR On Demand As Required £159.50 £34.20
NRSWA Unit 2-Signing Lighting & Guarding 1 Day City & Guilds On Demand As Required £109.50 £36.20
EUSR Chlorination Procedures 2 Days EUSR On Demand As Required £259.50 £34.20
NRSWA Unit 2 Reassessment 1 Day City & Guilds On Demand As Required £99.50 £36.20
NRSWA Unit 3-Excavation to the Highway 1 Day City & Guilds On Demand As Required POA £36.20
NRSWA Unit 4-Reinstatement & compaction of backfill materials 1 Day City & Guilds On Demand As Required POA £36.20
NRSWA Unit 5-Reinstatement of sub-base & road-base in non-bituminous materials 1 Day City & Guilds On Demand As Required POA £36.20
NRSWA Unit 6-Reinstatement in cold-lay bituminous material 1 Day City & Guilds On Demand As Required POA £36.20
NRSWA Unit 7-Reinstatement of hot lay 1 Day City & Guilds On Demand As Required POA £36.20
NRSWA Unit 8-Reinstatement of concrete slabs 1 Day City & Guilds On Demand As Required POA £36.20
NRSWA Unit 9-Reinstatement of modular &concrete footways 1 Day City & Guilds On Demand As Required POA £36.20
NRSWA Unit 10-Monitoring signing lighting and guarding 1 Day City & Guilds On Demand As Required £109.50 £36.20
NRSWA Unit 10 Reassessment 1 Day City & Guilds On Demand As Required £99.50 £36.20
NRSWA Unit 11-Monitoring excavation in the highway 1 Day City & Guilds On Demand As Required POA £36.20
NRSWA Unit 12-Monitoring reinstatement & compaction of backfill materials 1 Day City & Guilds On Demand As Required POA £36.20
NRSWA Unit 13-Monitoring reinstatement of sub-base &road-base in non bituminous materials 1 Day City & Guilds On Demand As Required POA £36.20
NRSWA Unit 14-Monitoring reinstatement in bituminous materials 1 Day City & Guilds On Demand As Required POA £36.20
NRSWA Unit 15-Monitor reinstatement of concrete slabs 1 Day City & Guilds On Demand As Required POA £36.20
NRSWA Unit 16-Monitoring reinstatement if modular & concrete footways 1 Day City & Guilds On Demand As Required POA £36.20